Coordination with AHJ

AHJ Coordinated Projects — Case Study

Seamless Commercial Plumbing Expansion & Permit Coordination

Design changes happen. Compliance doesn't slip.

A mid-construction design change on a Coquitlam commercial tenant improvement — resolved through direct coordination with the general contractor and the municipal plumbing department, without disrupting the build schedule.

LocationCoquitlam, BC
Specialty appliedAHJ Coordinated Projects
ScopeCommercial TI — plumbing rough-in
CoordinationGeneral contractor / City of Coquitlam

The Situation

VIA Plumbing was selected to complete the plumbing scope for a commercial tenant improvement project in the City of Coquitlam. The original bid and project planning were based on the latest engineered drawings submitted by the general contractor to the municipality for permit approval.

During the plumbing rough-in stage, the owner requested an additional mop sink that was not included in the original design — a live scope change that needed sign-off from the Authority Having Jurisdiction without stalling the job site.

Step by step

How VIA Coordinated It

Five stages, same structure throughout — from the original bid to a fully compliant close-out.

1
Award & Planning

Selected for the TI Scope

VIA Plumbing is selected to complete the plumbing scope for a commercial tenant improvement project. The bid and project planning are built on the latest engineered drawings already submitted to the municipality for permit approval.

2
Field Change

Mid-Construction Design Change

During the plumbing rough-in stage, the owner requests an additional mop sink that wasn't part of the original design — a fixture that now needs to be added to the approved permit scope.

Domestic water and sanitary fixture unit summary table with the added mop sink line item marked
Fixture summary revised — mop sink added to the load calc
3
AHJ Coordination

Coordinating with the AHJ

VIA works directly with the general contractor and the City of Coquitlam's municipal plumbing department to revise the scope, incorporate the additional fixture, and process the required permit and inspection steps.

Drawing stamped RECEIVED by City of Coquitlam Planning and Development, and revision log showing issued for building permit
Stamped by the City & carried through to permit issuance
4
Execution

Seamless Installation, No Schedule Slip

With the revised scope approved, VIA's team coordinates the fixture installation on site — keeping the rough-in moving forward without waiting on paperwork to catch up.

New mop sink installed and tested, with water running to the drain
Mop sink installed and tested on site
5
Close-Out

Documentation & Compliant Close-Out

All final documentation is properly completed and filed. The project delivers a fully compliant commercial plumbing solution — without disrupting the overall construction schedule.

Why This Job Highlights Our Specialty

This project shows VIA Plumbing's ability to respond quickly to design changes, coordinate effectively with contractors and municipal authorities, and deliver compliant commercial plumbing solutions without disrupting the construction schedule.
  • Absorbed a live design change mid-construction
  • Coordinated directly with GC and municipal AHJ
  • Revised scope, permit & inspection processed
  • Fixture installed to code, schedule maintained
  • Full documentation completed and compliant
  • Delivered without disrupting the build